PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued underground storm sewer roughing Facing East (800x600).jpg Backfilling inside Stair -4 pit Facing North-East(800x600).jpg Continued underground storm sewer roughing Facing South (800x600).jpg Delivery of manholes at Rahway Ave. (800x600).jpg Excavating for underground roughing along column line 2.5 from G-K Facing South-East (800x600).jpg Securing the shear wall panels at Elev.4-Stair -2 Facing South-West (800x600).jpg Welding the steel arch at Derrick -2 (2nd Floor) Facing East (800x600).jpg